For Sale Via Private Treaty | Portakabin Ultima Modular Building
VIEWING
Strictly by appointment only.
Email baadmin@johnpye.com
DEADLINE FOR OFFERS
Monday 5th January 2026.
For expressions of interest please email ben.ernstzen@johnpye.com
PAYMENT DEADLINE
Wednesday 7th January 2026
COLLECTION DEADLINE
Saturday 14th February 2026 – Monday 9th March 2026.
Please note: buyer to liaise directly with our client when payment has been received in full.
Location
Sutton Coldfield, Birmingham
Features
- A Portakabin ‘Ultima’ modular building encompassing a total floor area of 315.33m2.
- The building presently is formatted in an ‘L’ shape comprising 3 different large spaces, with an office and a meeting room.
- Two entrance lobbies.
- Four external doors.
- Two sets of toilets, five toilets in total.
- Two kitchenettes.
- Suspended ceilings within all three large spaces.
- Gas fired radiators throughout the building.
- Lighting units throughout the building.
- Two air conditioning units in the large area.
- All spaces are fitted with ‘Polyflor’ vinyl floor finishes.
- Whole building benefits from double glazing.
- There is a steel and reinforced plastic canopy attached to the rear of the building which can be included in the sale if required.
- The building was originally installed on site on 12th May 2003.
*Contents not included